Driveway Planning Permission and Permeable Driveways: A UK Guide

In England you don't need planning permission for a new or replacement front driveway if it uses a permeable (porous) surface, or if rainwater is directed to a lawn or border where it can soak away. If you use a non-permeable surface over 5 square metres that drains onto the road, you do need permission. Creating a new access onto a road also needs consent from the highway authority. Here's what that means in practice and how to choose the right surface.

The 5 square metre rule

  • Since 2008, paving more than 5 square metres of a front garden in England with a traditional, non-permeable surface that drains to the road needs planning permission.
  • Permeable options don't need permission: gravel, permeable block paving, porous asphalt and resin bound surfaces laid on a permeable base.
  • Non-permeable surfaces such as standard block paving, concrete or tarmac are fine without permission if the water is directed to a lawn, border or soakaway within your property.
  • Driveways in rear gardens aren't affected by this rule, but listed buildings, conservation areas and planning conditions can still restrict hard surfacing.

Dropped kerbs and new access

  • If you're creating a new access to a public road, you need permission from the highway authority (in Surrey, Surrey County Council) for a dropped kerb.
  • A new access onto a classified road (an A or B road) also needs planning permission.
  • Driving over a pavement without a dropped kerb isn't allowed.

Driveway surface options

  • Gravel: the simplest permeable option and well suited to rural properties. Use a stabilising grid to stop it rutting and migrating.
  • Resin bound: a smooth, porous finish of resin and aggregate laid on a porous base. Note that resin bonded (stone scattered on resin) isn't permeable.
  • Permeable block paving: blocks with wider joints filled with grit, laid on an open-graded stone base.
  • Tarmac and concrete: durable and cost effective, but need drainage to a soakaway, channel drain or lawn to avoid planning permission.
  • Grass reinforcement: plastic or concrete cells filled with grass or gravel, ideal for occasional parking and overflow areas.

How a driveway is built

  1. 01

    Survey and design

    We check levels, drainage, services, access and planning, then agree the layout and surface with you.

  2. 02

    Excavation

    The area is dug out to the right depth, usually 200 to 300 mm depending on the surface and the ground, and any soft spots removed.

  3. 03

    Edging and drainage

    Edgings are set to line and level, and any channel drains or soakaways are installed.

  4. 04

    Sub-base

    A layer of compacted stone goes in: MOT Type 1 for standard surfaces, or open-graded clean stone for permeable ones.

  5. 05

    Surface

    The chosen surface is laid to falls so water runs where it should.

  6. 06

    Finishing

    Joints are filled, edges tidied and the area cleaned, ready to use once any curing time has passed.